Files
proxmox/docs/bridge/trustless/audit/audit-request-template.md
defiQUG cb47cce074 Complete markdown files cleanup and organization
- Organized 252 files across project
- Root directory: 187 → 2 files (98.9% reduction)
- Moved configuration guides to docs/04-configuration/
- Moved troubleshooting guides to docs/09-troubleshooting/
- Moved quick start guides to docs/01-getting-started/
- Moved reports to reports/ directory
- Archived temporary files
- Generated comprehensive reports and documentation
- Created maintenance scripts and guides

All files organized according to established standards.
2026-01-06 01:46:25 -08:00

99 lines
1.9 KiB
Markdown

# Security Audit Request
## Project Information
**Project Name**: Trustless Bridge System
**Network**: ChainID 138 (Besu) ↔ Ethereum Mainnet
**Audit Type**: Smart Contract Security Audit
**Priority**: High
## Scope
### Contracts to Audit
1. **Lockbox138** (ChainID 138)
- Deposit contract
- Replay protection
- Deposit ID generation
2. **InboxETH** (Ethereum Mainnet)
- Claim submission
- Rate limiting
- Relayer fees
- Batch operations
3. **BondManager** (Ethereum Mainnet)
- Bond posting
- Bond slashing
- Bond release
- Batch operations
4. **ChallengeManager** (Ethereum Mainnet)
- Fraud proof verification
- Challenge mechanism
- Finalization logic
- Batch operations
5. **LiquidityPoolETH** (Ethereum Mainnet)
- Liquidity management
- Fee distribution
- Minimum ratio enforcement
6. **SwapRouter** (Ethereum Mainnet)
- DEX integration
- Slippage protection
- Route validation
7. **BridgeSwapCoordinator** (Ethereum Mainnet)
- Bridge + swap coordination
- Claim verification
8. **Libraries**
- MerkleProofVerifier
- FraudProofTypes
## Focus Areas
1. **Economic Security Model**
- Bond sizing calculations
- Slashing mechanics
- Economic attack scenarios
2. **Fraud Proof Implementation**
- Merkle proof verification
- Fraud proof types
- Verification logic
3. **Access Control**
- Admin functions
- Authorization mechanisms
- Multisig integration
4. **Rate Limiting**
- Cooldown mechanisms
- Hourly limits
- Spam prevention
5. **Batch Operations**
- Gas efficiency
- Error handling
- Reentrancy protection
## Deliverables
- Comprehensive audit report
- Risk assessment
- Recommendations
- Fix prioritization
## Timeline
- **Request Date**: [DATE]
- **Proposed Start**: [DATE]
- **Expected Completion**: [DATE]
- **Remediation Period**: 2-4 weeks
## Contact
[Your Contact Information]