Operational baseline — current hardware running / in-hand

Hardware already deployed, active, or physically in-hand (not part of available wholesale inventory). Quantities marked TBD are to be confirmed and locked during physical audit. Once confirmed, this document is the authoritative operational baseline for Sankofa Phoenix.


A1. Compute servers (operational)

HPE ProLiant ML110 series

  • Role: Core services / management / utility workloads
  • Form factor: Tower / rack-convertible
  • Status: Running / in-hand
  • Quantity: TBD
  • Notes: Suitable for control-plane services, monitoring, identity, light virtualization

Dell PowerEdge R630

  • Role: General compute / virtualization / legacy workloads
  • Form factor: 1U rackmount
  • Status: Running / in-hand
  • Quantity: TBD
  • Notes: Ideal for Proxmox clusters, utility VMs, staging environments

A2. Network and edge infrastructure

UniFi Dream Machine Pro (UDM Pro)

  • Role: Edge gateway, UniFi OS controller, firewall
  • Status: Running / in-hand
  • Quantity: TBD
  • Notes: Per-site edge control; candidate for per-sovereign controller domains

UniFi XG switches

  • Role: High-throughput aggregation / core switching
  • Status: Running / in-hand
  • Quantity: TBD
  • Notes: 10G/25G backbone for compute and storage traffic

A3. ISP and external connectivity

Spectrum Business cable modems

  • Role: Primary or secondary WAN connectivity
  • Status: Installed / in-hand
  • Quantity: TBD
  • Notes: Business-class internet access; typically paired with UDM Pro

A4. Physical infrastructure and power

APC equipment cabinets

  • Role: Secure rack enclosure
  • Status: Installed / in-hand
  • Quantity: TBD
  • Notes: Houses compute, network, and power equipment

APC UPS units

  • Role: Power conditioning and battery backup
  • Status: Installed / in-hand
  • Quantity: TBD
  • Notes: Runtime and load to be captured per site for capacity planning

A5. Operational classification summary

Category Status Quantity
ML110 servers Running TBD
Dell R630 servers Running TBD
UDM Pro Running TBD
UniFi XG switches Running TBD
Spectrum modems Installed TBD
APC cabinets Installed TBD
APC UPS units Installed TBD

A6. Next actions (to finalize baseline)

  1. Physical audit — Lock quantities and serials per site/rack.
  2. Import into sankofa-hw-infra — Create as Operational Assets (assets with category, site, rack position).
  3. Attach to sites, racks, power feeds — Populate site hierarchy and power metadata.
  4. Enable integrations — UniFi (device mapping), Proxmox (node ↔ server), UPS monitoring where supported.

After quantities and serials are confirmed, this appendix is the authoritative operational baseline for capacity planning, BOM, and compliance.