Phase 5 Tasks - Final Polish + Packaging (Days 85-90)

Week 11-12: Testing & Build Delivery (Days 71-90)

Testing & QA

  • Review testing checklist
  • Test all gameplay systems
  • Test all interactions
  • Test vehicle systems
  • Test NPC systems
  • Test lighting (all time of day)
  • Test performance on target hardware
  • Test streaming and loading
  • Test UI systems
  • Test audio systems
  • Document bugs found
  • Fix critical bugs
  • Fix high-priority bugs
  • Fix medium-priority bugs (time permitting)
  • Re-test fixed bugs
  • Validate bug fixes

Audio Integration

  • Research audio requirements
  • Source/create A_AmbientCity audio
  • Source/create A_VehicleSounds audio
  • Source/create A_Footsteps audio
  • Source/create A_Music audio
  • Import audio to Unreal
  • Set up audio cues
  • Place ambient audio in level
  • Configure 3D spatial audio
  • Test audio in level
  • Adjust audio levels
  • Validate audio quality

Final Configuration

  • Configure BP_GameMode
  • Set up default game mode
  • Configure DefaultEngine.ini
  • Configure DefaultGame.ini
  • Set up final project settings
  • Validate all settings
  • Test final configuration

Build Packaging

  • Research packaging requirements
  • Configure packaging settings
  • Set build configuration to Shipping
  • Test packaging process
  • Package Windows build
  • Test packaged build
  • Validate build functionality
  • Check build size
  • Optimize build size if needed

Pixel Streaming (Optional)

  • Research Pixel Streaming setup
  • Install Pixel Streaming plugin
  • Configure Pixel Streaming server
  • Set up web server
  • Test Pixel Streaming
  • Validate streaming quality
  • Document Pixel Streaming setup

VR Support (Optional)

  • Research VR requirements
  • Install OpenXR plugin
  • Configure VR settings
  • Create VR-specific maps
  • Test VR mode
  • Validate VR performance
  • Document VR setup

Final Documentation

  • Review all documentation
  • Update documentation as needed
  • Create DEVELOPER_HANDOFF.md
  • Create ASSET_CATALOG.md
  • Create TECHNICAL_SPECS.md
  • Create DEPLOYMENT_GUIDE.md
  • Finalize all documentation
  • Validate documentation completeness

Developer Handoff Kit

  • Organize source files
  • Organize documentation
  • Create handoff package
  • Include all necessary files
  • Create handoff checklist
  • Validate handoff package

Final Review

  • Internal final review
  • Stakeholder review
  • Gather final feedback
  • Address critical feedback (if any)
  • Final approval
  • Prepare for delivery

Progress Report

  • Create final_report.md
  • Document project completion
  • Document lessons learned
  • Document recommendations
  • Finalize progress report

Deliverables Checklist

Final Deliverables

  • Comprehensive testing completed
  • All bugs fixed (critical and high-priority)
  • Audio integrated
  • Final build packaged
  • Pixel Streaming setup (optional)
  • VR stub created (optional)
  • Complete documentation
  • Developer handoff kit prepared
  • Final review completed
  • Delivery approved

Notes

  • Testing is critical - allocate sufficient time
  • Audio adds polish - don't skip this step
  • Documentation is important for handoff - ensure completeness
  • Final review should be thorough - catch issues before delivery

Status: Pending Last Updated: [Current Date]